List of project activities with organisations that will implement each activity, expected results outputs and deliverables and the time period.
Name | Org. | Output | Period | |
---|---|---|---|---|
1 | Interface with EU authorities and coordination. | INGV | Communications and Internal Report | Jan 2012 Dec 2013 |
2 | Technical analysis of the communication problems related to the identification and designation of CIs in the interested area. | INGV CNIT |
Technical Report | Jan 2012 Sep 2012 |
3 | Determination of the topology of high survival radio communication network. | INGV CNIT |
Technical Report | Jan 2012 Sep 2012 |
4 | Characterization of the minimal amount of information necessary for the survival of the CIs communication. | INGV CNIT |
Technical Report | Oct 2012 Jan 2013 |
5 | Operative supervision of the network architecture. | INGV CNIT |
Technical Report | Jan 2013 Apr 2013 |
6 | Analysis of the existing architecture of HF communication based on internet protocol access with reference to the above considered infrastructures. | CNIT | Technical Report | Jan 2012 Jun 2012 |
7 | Analysis of existing HF connection system in terms of software and hardware for internet connection. | CNIT | Technical Report | Jan 2012 Jun 2012 |
8 | Definition of the High survival HF radio network technical requirements. | CNIT | Technical Report | Jan 2012 Jun 2012 |
9 | Radio network system design. | CNIT | Technical Report | Jan 2012 Dec 2012 |
10 | Criteria of early warning alert and procedures to activate the back up network. | CNIT | Technical Report | Jan 2012 Dec 2012 |
11 | Monthly prediction of the hourly HF set of frequencies over the n radio links given by the network, based on the available ionospheric model and methods. | INGV EO |
Technical Report | Jan 2013 Apr 2013 |
12 | Daily forecasting of the hourly HF set of frequencies based on the Mediterranean ionospheric measurements. | INGV EO |
Technical Report | Jan 2013 Apr 2013 |
13 | Ground wave propagation analysis when required. | INGV | Technical Report | Aug 2013 Dec 2013 |
14 | Frequency management system for HF communication link optimization. | INGV EO |
Technical Report | Aug 2013 Dec 2013 |
15 | Identification of the professional profile able to maintain and operate network. | INGV CNIT NOA EO |
Technical Report | Oct 2013 Dec 2013 |
16 | Dissemination of deliverables within communities informing about initiatives organised in the context of the project. | INGV CNIT NOA EO |
Technical Report | Oct 2013 Dec 2013 |
17 | Professional training activities trough courses, workshops and conferences. | INGV CNIT NOA EO |
Technical Report | Oct 2013 Dec 2013 |
18 | Assessment of the potential impact and feasibility of the project for ECIs and CGAs and final recommendations for the EC. | INGV CNIT NOA EO |
Technical Report | Oct 2013 Dec 2013 |
19 | Realization of a demonstrator constituted by 4- terminals HF network. | INGV CNIT |
Realization of the demonstrator | Jan 2012 Dec 2013 |